Thursday, April 26, 2007

First Floor Exterior Walls

The first floor exterior walls have been erected.

This first photo is taken from the front right side of the house...



This photo is taken from the rear right side...

Saturday, April 21, 2007

Framing Started!

Framing on the house has begun. First floor deck installed.

Wednesday, April 18, 2007

Foundation Walls Poured

Nothing too exciting but the 9' basement walls have been poured. Back-filling should start today and then the framing crew begins.


Thursday, April 12, 2007

Footings Poured!

The footings were poured today. Foundation walls should be in by the end of the week. Framing should begin Monday!


Cleared Lot

Below are photos of the lot after it was cleared. As you can see the existing foundation has been removed...along with a lot of trees..Quite a different look!



Uncleared Lot

Below are photos of the wooded lot before we purchased it. You'll notice the block foundation that was there from a home that was on the lot.